當我們買一臺斗式提升機回去時,除了讓他給我們工作外,還要給它經常維護,俗話說有付出就有收獲,我們只要好好對待我們的提升機設備,它也一定會為我們好好工作的。這樣給我們制造的價值也就更大。對于沒有經驗的機器的維護保養(yǎng)是一項極其重要的經常性的工作,它應與極其的操作和檢修等密切配合,所以應該有人員進行值班檢查。
一.機器的維護:
1、軸承 提升機的軸承擔負機器的全部負荷,所以良好的潤滑對軸承壽命有很大的關系,它直接影響到機器的使用壽命和運轉率,因而要求注入的潤滑油必須清潔,密封必須良好,本機器的主要注油處 。
2、新安裝的輪箍容易發(fā)生松動必須經常進行檢查。
3、注意機器各部位的工作是否正常。
4、注意檢查易磨損件的磨損程度,隨時注意更換被磨損的零件。
5、放活裝置的底架平面,應出去灰塵等物以免機器遇到不能破碎的物料時活動軸承不能在底架 上移動,以致發(fā)生嚴重事故.
6、軸承油溫升高,應立即停車檢查原因加以消除.
7、轉動齒輪在運轉時若有沖擊聲應立即停車檢查,并消除。
二.安裝試車:
1、該設備應安裝在水平的混凝土基礎上,用地腳螺栓固定。
2、安裝時應注意主機體與水平的垂直。
3、安裝后檢查各部位螺栓有無松動及主機艙門是否緊固,如有請進行緊固。
4、按設備的動力配置電源線和控制開關。
5、檢查完畢,進行空負荷試車,試車正常即可進行生產。
斗式提升機日常維護技巧英文版
When we buy a bucket elevator to go back, in addition to ask him to our work, but also give it a regular maintenance, as the saying goes, there is a harvest, as long as we treat our hoist equipment, it will provide us a good job. It gives us the manufacturing value is greater. On the lack of experience of machine maintenance is a very important regular work, it should be with extremely the operation and maintenance of close cooperation, so there should be a personnel on duty to check. A machine maintenance:
In 1, the bearing load bearing hoist machine full load, so the good lubrication on bearing life have a great relationship, it directly affects the service life of the machine and the running rate, thus requiring into the lubricating oil must be clean, seal must be in good condition, the main oiling machine at.
In 2, the newly installed tire easily loosened must always check.
3, pay attention to whether or not the work of machine parts.
4, pay attention to check the wear parts wear degree, always pay attention to replace the worn parts.
5, deregulating the device frame plane, should go out dust and dirt to avoid machine doesn't broken material activities bearing can not on the chassis of mobile, so that a serious accident.
6, bearing temperature, stop and check the reason to be eliminated.
In 7, the rotary gear in operation if the impact of noise check should be immediately stopped, and the elimination of.
Installation and test run of two:
In 1, the device should be installed in horizontal concrete foundation, fixed with anchor bolts.
In 2, the installation should pay attention to the main body and the horizontal and vertical.
3, check after installation of the bolts looseness and host doors are secured, please fasten.
In 4, according to equipment power distribution power line and a control switch.
5, check, for no load test, the test can be produced in normal.